2022 2 AFRICA & BLUE

Pre Lay Grapnel Run (PLGR) & Route Clearance (RC) for the BLUE and 2Africa projects in the Mediterranean Sea

Location: Marseille France, Digue du large
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): N/A
Water depth (m) :
Vessel: N/A
Trenching system: N/A
Trenching depth (m): N/A
Product:
cable type: