Home » Projets » 2025 HE DREIHT

2025 HE DREIHT

Assistance to laying, PLIB

Location: USA
Customer: SEAWAY 7

Length (km): 98 km
Water depth (m) :
Vessel: Seaway AimeryS
Beaching system: ROVJET 1210 B
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2023 YUNLIN

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos