Home » Projets » 2025 2 AFRICA PEARLS KUWAIT

2025 2 AFRICA PEARLS KUWAIT

1 x Direct landing in Kuwait City, shell installation, post-burial.

Location: Kuwait Salmiya Beach
Customer: ALCATEL SUBMARINE NETWORKS

Length (km): 960 m
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2020 Dunant

    Pre lay shore end. 5 km cable installation with laying and burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2009 IMEWE/MENA/TEN/EIG

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : TO Mobile
    Plus d’infos
  • 2013 AMX COLOMBIA

    2 separate shore ends at Cartagena and Barranquilla + Installation of mattresses.
    Burial system : EBJ (jetting)
    Plus d’infos