2025 2Africa PEARLS
Direct landing in Kalba (United Arab Emirates), installation of protection shells, and post-burial of 2.3 km of fiber optic cable.
Location: Kalba – United Arab Emirates
Client: ASN
Year: December 2025
Length (km): 2.3 km
Burial System: EBJ
Product: Fiber Optic Cable




