Home » Projets » 2025 2Africa PEARLS

2025 2Africa PEARLS

Direct landing in Kalba (United Arab Emirates), installation of protection shells, and post-burial of 2.3 km of fiber optic cable.

Location: Kalba – United Arab Emirates
Client: ASN
Year: December 2025

Length (km): 2.3 km
Burial System: EBJ
Product: Fiber Optic Cable

Other projects

  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2023 2 AFRICA MOZAMBIQUE

    1 x Direct landing at Nacala, shell installation, post-burial. Installing the grounding system
    Burial system :
    Plus d’infos
  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos