Home » Projets » 1998 BELIZE

1998 BELIZE

Main land to island / 34.5 kV power extension.

Location : BELIZE / BOMBA – BOCA CHICA
Client : ALCATEL / BELIZE ELECTRICITY

Length (km): 19,5
Water depth (m) : 3,3
Vessel : Spud Barge
Burial system : TJV04 : Jetting sled
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 22,6
Diameter : 118 mm

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2003 ILE D’YEU

    Mainland to island / Shore ends / Laying and burial of 20 kV pc
    Burial system : N.A.
    Plus d’infos
  • 2017 QUINTILLION ALASKA

    1 separate shore end. 16 km cable installation with laying and burial.
    Burial system : ESV12 (vibrating plough)
    Plus d’infos