Home » Projets » 1998 BELIZE

1998 BELIZE

Main land to island / 34.5 kV power extension.

Location : BELIZE / BOMBA – BOCA CHICA
Client : ALCATEL / BELIZE ELECTRICITY

Length (km): 19,5
Water depth (m) : 3,3
Vessel : Spud Barge
Burial system : TJV04 : Jetting sled
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 22,6
Diameter : 118 mm

Other projects

  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2014 BUTENDIEK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos