Home » Projets » 2000 PEC / LEVEL 3/ FLUTE

2000 PEC / LEVEL 3/ FLUTE

PLIB works on telecom fibre optic cable crossings.

Location : ENGLISH CHANNEL (Manche)
Client : ALCATEL SUBMARINE NETWORKS

Length (km): 13,8
Water depth (m) : 56
Vessel : DP Vessel
Burial system : MED 1: Dredge pump / jetting tool
Burial depth (m) : 0,8-1,2
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 41 mm

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2000 FLAG ATLANTIC 1

    3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.
    Burial system : MED1 (Jetting) and ESV11 (Plough)
    Plus d’infos
  • 2025 CSN-1 COLOMBIA

    Separate landing in Barranquilla. Laying and post-wiring of 8.5 km of fiber optic cable, Installation of grounding system
    Burial system :
    Plus d’infos