Home » Projets » 2000 Dumpton Gap – Level 3

2000 Dumpton Gap – Level 3

Remedial work : Lay and simultaneous burial of fibre optic cable.

Location : ENGLISH CHANNEL
Client : Offshore DUMPTON GAP LEVEL 3 FO cable system (ALCATEL SUBMARINE NETWORKS)

Length (km): 5,4
Water depth (m) : 25
Vessel : Barge
Burial system : ESV11 (Plough)
Burial depth (m) : 1,4
Product : Fibre optic cable
Weight (kg/m) : 5,4
Diameter : 46 mm

Other projects

  • 2003 AL KHAFJI

    Laying and burial of 40 km of power cable in Saudi Arabia.
    Burial system : TM02 (Trencher)
    Plus d’infos
  • 2023 BLUE BASTIA

    1 x Direct landing in Bastia, shell installation, post-burial, anchor installation with posidonies
    Burial system :
    Plus d’infos
  • 2013 VISCAS SIR BANYAS

    Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
    Burial system : TM04 (trencher)
    Plus d’infos