Home » Projets » 2001 ANTARES

2001 ANTARES

Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).

Location : FRANCE
Client : LA SEYNE SUR MER (ALCATEL SUBMARINE NETWORKS)

Length (km): 41,5
Water depth (m) : 2400
Vessel : DP Vessel
Burial system : N.A.
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 9,7
Diameter : 21,5 to 57,7 mm

Other projects

  • 2008 TAURT FIELD DEVELOPMENT

    Post trenching of subsea umbilical / PLIB
    Burial system : ROVJET401 (Jetting)
    Plus d’infos
  • 2024 MAJAN 1

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2002 FLAG SOUTH PLIB

    PLIB works on telecommunication fibre optic cable.
    Burial system : MED1 (Dredge pump)
    Plus d’infos