Home » Projets » 2005 ORASCOM MED CABLE

2005 ORASCOM MED CABLE

MED CABLE direct shore ends (FO)

Location : Mediterranean Sea
Client : Alcatel Submarine Networks

Length (km): 3,75
Water depth (m) : 12
Vessel : Pontoon
Burial system : TJV07 (Jetting)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 46 mm

Other projects

  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos
  • 2022 EQUIANO

    1 x Direct landing at Sesimbra, shell installation and post-burial.
    Burial system :
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos