Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.

Location : Delma Island (UAE)
Client : NEXANS Norway

Length (km): 85
Water depth (m) : 35
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 55
Diameter : 194 mm

Other projects

  • 2001 SAT 3

    DOUALA and LIBREVILLE shore ends / Laying and burial of FO cable
    Burial system : TJV05 – TJV04 (Jetting) + ESV12 (Plough)
    Plus d’infos
  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2012 CAT – THAÏLAND

    2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.
    Burial system : EBJ 04 + ESV12 (jetting)
    Plus d’infos