2008 DELMA

Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.

Location : Delma Island (UAE)
Client : NEXANS Norway

Length (km): 85
Water depth (m) : 35
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 55
Diameter : 194 mm

Other projects

  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2010 HONOTUA

    FO cable shore ends, PLIB and installation of articulated pipes.
    Burial system : Dredge pump (with divers)
    Plus d’infos
  • 2014 EMF Trials in situ

    Performance of trenching trials for the construction works of the French offshore windfarms.
    Burial system : ROVJET806 (jetting) + TM03 (trencher / vibrating plough)
    Plus d’infos