Home » Projets » 2008 PERENCO – CAMEROON

2008 PERENCO – CAMEROON

Barge operating for pipe laying

Location : CAMEROON
Client : PERENCO

Length (km): 8,6
Water depth (m) : 35
Vessel : Barge
Burial system : N.A.
Burial depth (m) : N.A.
Product : Flexible pipeline
Weight (kg/m) : 
Diameter : 8 mm

Other projects

  • 2000 VNF LILLE

    Along river – canal / 1 telecommunication fibre optic cable.
    Burial system : Machine LD CABLE : Towed plough
    Plus d’infos
  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos