Home » Projets » 2008 PERENCO RDC

2008 PERENCO RDC

Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.

Location : Democratic Republic of the Congo
Client : PERENCO

Length (km): 22
Water depth (m) : 20
Vessel : Barge
Burial system : EBJ 04 (jetting)
Burial depth (m) : 0,8
Product : Power Cable
Weight (kg/m) : 7
Diameter : 96 mm

Other projects

  • 2025 2 AFRICA PEARLS BARHEIN

    Separate landing in Bahrain. Laying and post-wiring 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2007 ATLAS OFFSHORE

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2023 BLUE GENOA

    2 x Direct landings at Genoa in a directional borehole. Shell installation
    Burial system :
    Plus d’infos