Home » Projets » 2008 PERENCO RDC

2008 PERENCO RDC

Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.

Location : Democratic Republic of the Congo
Client : PERENCO

Length (km): 22
Water depth (m) : 20
Vessel : Barge
Burial system : EBJ 04 (jetting)
Burial depth (m) : 0,8
Product : Power Cable
Weight (kg/m) : 7
Diameter : 96 mm

Other projects

  • 2021 HORNSEA 2

    Provision of personnel and equipment to carry out the post lay burial of infield array cables.
    Burial system :
    Plus d’infos
  • 2004 SIR BANIYAS

    Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2000 Dumpton Gap – Level 3

    Remedial work : Lay and simultaneous burial of fibre optic cable.
    Burial system : ESV11 (Plough)
    Plus d’infos