Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.

Location : Democratic Republic of the Congo
Client : PERENCO

Length (km): 22
Water depth (m) : 20
Vessel : Barge
Burial system : EBJ 04 (jetting)
Burial depth (m) : 0,8
Product : Power Cable
Weight (kg/m) : 7
Diameter : 96 mm

Other projects

  • 2021 Saint Nazaire OWF

    EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection
    Burial system :
    Plus d’infos
  • 2024 MARSEILLE

    1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2018 ASC Indonesia

    Post lay inspection and burial of 41 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)