Cable laying and burial between mainland and platforms. Barge operating for pipe laying + special liftings + J-tube pullin.

Location : Democratic Republic of the Congo
Client : PERENCO

Length (km): 22
Water depth (m) : 20
Vessel : Barge
Burial system : EBJ 04 (jetting)
Burial depth (m) : 0,8
Product : Power Cable
Weight (kg/m) : 7
Diameter : 96 mm

Other projects

  • 2023 CFXD

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 2011 KASHAGAN

    Provison of burial services for 4 power and FO cables and 6 umbilicals.
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)