Home » Projets » 2009 KASHAGAN

2009 KASHAGAN

Provison of burial services for 1 power cable and 2 umbilicals.

Location : Kashagan oil field – Kazakhstan
Client : SONSUB (for SAIPEM)

Length (km): 18
Water depth (m) : 6
Vessel : Barge
Burial system : TM03 (Trencher)
Burial depth (m) : 2
Product : Flowline / Power cable
Weight (kg/m) : 1,4 
Diameter : 23 mm

Other projects

  • 2023 MUANDA

    Separate landing at Muanda. Laying and post-wiring of 22 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2025 2 AFRICA PEARLS

    Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2011 KASHAGAN

    Provison of burial services for 4 power and FO cables and 6 umbilicals.
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos