Home » Projets » 2010 MANIFA

2010 MANIFA

Provison of technical and engineering services / Cable laying and trenching services.

Location : Manifa oil field
Client : Valentine Maritime Saudi Ltd

Length (km): 29,2
Water depth (m) : 11
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power cable

Other projects

  • 2007 PICOT / GONDWANA

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2018 ASC Indonesia

    Post lay inspection and burial of 41 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos
  • 2011 WALNEY 1

    Post Lay Inspection and Burial of infield power cables
    Burial system : ROVJET605 (jetting)
    Plus d’infos