2011 WALNEY 2

Post Lay Inspection and Burial of 51 infield power cables.

Location : Walney Offshore Windfarm – Irish Sea
Client : VSMC-DONG

Length (km): 50
Water depth (m) : 20
Vessel : DP vessel
Burial system : ROVJET605 (jetting)
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 22
Diameter : max 133 mm

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2023 ZAKYNTIS

    LD Travocean was subcontracted by Asso Subsea for trenching work. ROVJET 1217 was deployed on the TSV MV Astrea to carry out PLB water jet cleaning on the 21 km electrical interconnection.
    Burial system :
    Plus d’infos
  • 2016 FITZROY Darwin

    1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos