2012 CAT – THAÏLAND

2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.

Location : Sri Racha and Songkhla / Gulf of Thailand
Client : ALCATEL LUCENT

Length (km): 27
Water depth (m) : 28
Vessel : Barge
Burial system : EBJ 04 + ESV12 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable

Other projects

  • 2015 BALTIC 2

    Provision of personnel and equipment to carry out the post burial of 75 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2000 VNF LILLE

    Along river – canal / 1 telecommunication fibre optic cable.
    Burial system : Machine LD CABLE : Towed plough
    Plus d’infos
  • 2025 2 AFRICA PEARLS

    Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable
    Burial system :
    Plus d’infos