Home » Projets » 2012 CAT – THAÏLAND

2012 CAT – THAÏLAND

2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.

Location : Sri Racha and Songkhla / Gulf of Thailand
Client : ALCATEL LUCENT

Length (km): 27
Water depth (m) : 28
Vessel : Barge
Burial system : EBJ 04 + ESV12 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable

Other projects

  • 2000 VNF LILLE

    Along river – canal / 1 telecommunication fibre optic cable.
    Burial system : Machine LD CABLE : Towed plough
    Plus d’infos
  • 2024 2 AFRICA PEARLS

    1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2003 IFA 2000 – CABLE 11 REPAIR

    500 MW HVDC Power cable repair.
    Burial system : MED1 (Dredge pump)
    Plus d’infos