2012 CAT – THAÏLAND

2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.

Location : Sri Racha and Songkhla / Gulf of Thailand
Client : ALCATEL LUCENT

Length (km): 27
Water depth (m) : 28
Vessel : Barge
Burial system : EBJ 04 + ESV12 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable