Home » Projets » 2013 ANHOLT

2013 ANHOLT

Post Lay Inspection and Burial of 111 infield power cables

Location : ANHOLT Offshore Windfarm / Kattegat Sea (DANEMARK)
Client : VSMC/DONG

Product : Power Cable 
Length (km): 141
Water depth (m) : 14 to 20
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 34
Diameter : max 140 mm

Other projects

  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2006 THAILAND KHO SAMUI

    Shore ends/Mainland to island/Laying and burial of 115 kV power cable
    Burial system : TJV05 – TJV08 (Jetting)
    Plus d’infos
  • 2023 BLUE PALERMO

    1 x Direct landing in Palermo, shell installation, post-burial. Installing the grounding system
    Burial system :
    Plus d’infos