Home » Projets » 2013 ANHOLT

2013 ANHOLT

Post Lay Inspection and Burial of 111 infield power cables

Location : ANHOLT Offshore Windfarm / Kattegat Sea (DANEMARK)
Client : VSMC/DONG

Product : Power Cable 
Length (km): 141
Water depth (m) : 14 to 20
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 34
Diameter : max 140 mm

Other projects

  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos
  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2000 FLAG ATLANTIC 1

    3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.
    Burial system : MED1 (Jetting) and ESV11 (Plough)
    Plus d’infos