Laying of 43 km of power cable between mainland / platforms and platforms. Post burial of 22.5 km of cable. I-tube and Jtube pulling.
Location : Democratic Republic of the Congo – Congo
Client : PERENCO
Length (km): 43
Water depth (m) : 0 to 100
Vessel : Barge
Burial system : ROVJET 806 + EBJ : jetting
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 19
Diameter : 105 mm

Other projects

  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos
  • 2005 FALCON

    Separate shore ends / Laying and burial of FO cable
    Burial system : TJV05 – EBJ03 (Jetting)
    Plus d’infos
  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)