Home » Projets » 2014 WINTERSHALL

2014 WINTERSHALL

Provision of personnel and equipment to carry out the post burial of 1 umbilical between 2 offshore platforms.

Location : Dutch sector of North Sea
Client : VBMS

Product : Umbilical
Length (km): 19
Water depth (m) : 30 m
Vessel : DP Vessel
Burial system : ROVJET806 (jetting)
Burial depth (m) : 1
Weight (kg/m) : –
Diameter : 

Other projects

  • 2022 GRACE HOPPER

    Separate landing in a directional borehole. Simultaneous installation and beaming with mechanical trencher
    Burial system :
    Plus d’infos
  • 2011 WALNEY 2

    Post Lay Inspection and Burial of 51 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos
  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos