Home » Projets » 2016 VEJA MATE

2016 VEJA MATE

Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.

Location : Veja Mate Windfarm / North sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 87
Water depth (m) : up to 40 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2023 CONGO

    Separate landing at Pointe Noire. Laying and post-wiring of 8.8 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 1996 THAILANDE

    KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos