Home » Projets » 2016 VEJA MATE

2016 VEJA MATE

Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.

Location : Veja Mate Windfarm / North sea (German waters)
Client : Siem Offshore Contractors

Product : Power Cable 
Length (km): 87
Water depth (m) : up to 40 m
Vessel : DP Vessel
Burial system : ROVJET810 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2020 JOHAN SVERDRUP 2

    Post lay burial of seismic fibre optic cable in Johan Sverdrup Field (Equinor)
    Burial system : ROVJET 1206
    Plus d’infos
  • 1996 THAILANDE

    Mainland to KO SAMUI Island /Laying and burial of 115 kV power cable
    Burial system : TM02 (Trencher) – TJV04 (Jetting)
    Plus d’infos
  • 2019 SVERDRUP

    Post lay burial of 199 km of sismic fibre optic cables in Johan Sverdrup field
    Burial system : ROVJET 1206 (jetting)
    Plus d’infos