Home » Projets » 1996 THAILANDE

1996 THAILANDE

KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable

Location : THAILAND / KO PHANGAN island to KOH SAMUI island
Client : ALCATEL / PEA

Length (km): 14,6
Water depth (m) : 20
Vessel : Barge
Burial system : TM02 (Trencher) – TJV04 (Jetting)
BD (m) : 1
Product : Power cable
Weight (kg/m) : 32
Diameter : 112 mm

Other projects

  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos
  • 2011 WACS

    FO cable separate and direct shore ends in Congo and Angola / PLIB / installation of mattresses with ROS
    Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
    Plus d’infos
  • 2022 MAPUTO

    Separate landing in Maputo. Laying and post-wiring of 42 km of fiber-optic cable
    Burial system :
    Plus d’infos