Home » Projets » 1996 THAILANDE

1996 THAILANDE

KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable

Location : THAILAND / KO PHANGAN island to KOH SAMUI island
Client : ALCATEL / PEA

Length (km): 14,6
Water depth (m) : 20
Vessel : Barge
Burial system : TM02 (Trencher) – TJV04 (Jetting)
BD (m) : 1
Product : Power cable
Weight (kg/m) : 32
Diameter : 112 mm

Other projects

  • 2023 ANGOLA

    Separate landing in Luanda. Laying and post-wiring of 7.2 km of fiber-optic cable
    Burial system :
    Plus d’infos
  • 2015 SEA LION Rostock

    1 shore end in Germany + Laying and burial of the same cable offshore in Denmark, in low water depths.
    Burial system : ROVJET404 + EBJ (jetting)
    Plus d’infos
  • 2007 PICOT / GONDWANA

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos