1996 THAILANDE

KO PHANGAN island to KOH SAMUI island / Laying and burial of 33 kV power cable

Location : THAILAND / KO PHANGAN island to KOH SAMUI island
Client : ALCATEL / PEA

Length (km): 14,6
Water depth (m) : 20
Vessel : Barge
Burial system : TM02 (Trencher) – TJV04 (Jetting)
BD (m) : 1
Product : Power cable
Weight (kg/m) : 32
Diameter : 112 mm