Home » Projets » 1998-1999 VNF PARIS

1998-1999 VNF PARIS

Along river / Laying and burial of 3 multiple FO cables laid in one go.

Location : FRANCE / NEUILLY-CONFLANS – SEINE River
Client : MCI WORLDCOM, LD COM NETWORKS, VIATEL, TELIA

Length (km): 850
Water depth (m) : 15
Vessel : Spub Barge / River Barge
Burial system : ESV 07 / ESV11 (Plough)
BD (m) : 0,75
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 25 mm

Other projects

  • 2024 MARSEILLE

    1 x Direct landing in Marseille, installation of shells, post-sinking, installation of posidonia anchors. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2025 2 AFRICA PEARLS

    Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2017 BEATRICE OWF

    Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos