Home » Projets » 1998-1999 VNF PARIS

1998-1999 VNF PARIS

Along river / Laying and burial of 3 multiple FO cables laid in one go.

Location : FRANCE / NEUILLY-CONFLANS – SEINE River
Client : MCI WORLDCOM, LD COM NETWORKS, VIATEL, TELIA

Length (km): 850
Water depth (m) : 15
Vessel : Spub Barge / River Barge
Burial system : ESV 07 / ESV11 (Plough)
BD (m) : 0,75
Product : Fibre optic cable
Weight (kg/m) : 2
Diameter : 25 mm

Other projects

  • 2013 VISCAS SIR BANYAS

    Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)
    Burial system : TM04 (trencher)
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos
  • 2005 ORASCOM MED CABLE

    MED CABLE direct shore ends (FO)
    Burial system : TJV07 (Jetting)
    Plus d’infos