Home » Projets » 2001 ANTARES

2001 ANTARES

Cable lay between LA SEYNE SUR MER and the Neutrinos Telescope ANTARES (max. depth 2400 m).

Location : FRANCE
Client : LA SEYNE SUR MER (ALCATEL SUBMARINE NETWORKS)

Length (km): 41,5
Water depth (m) : 2400
Vessel : DP Vessel
Burial system : N.A.
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 9,7
Diameter : 21,5 to 57,7 mm

Other projects

  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 1999 DCN TOULON

    Power and composite cables inside miltary harbour.
    Burial system : N.A.
    Plus d’infos
  • 2000 PEC / LEVEL 3/ FLUTE

    PLIB works on telecom fibre optic cable crossings.
    Burial system : MED 1: Dredge pump / jetting tool
    Plus d’infos