2001 ULYSSE

Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).

Location : ENGLISH CHANNEL
Client : ULYSSES 1 South FO Cable (MCI WORLDCOM)

Length (km): 5,1
Water depth (m) : 35
Vessel : Barge
Burial system : MED1 (Dredge pump) – ESV12 (Plough)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 9,7
Diameter : 57 mm

Other projects

  • 2021 AMITIE

    Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.
    Burial system :
    Plus d’infos
  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2018 MERKUR OWF

    Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos