Home » Projets » 2005 ORASCOM MED CABLE

2005 ORASCOM MED CABLE

MED CABLE direct shore ends (FO)

Location : Mediterranean Sea
Client : Alcatel Submarine Networks

Length (km): 3,75
Water depth (m) : 12
Vessel : Pontoon
Burial system : TJV07 (Jetting)
Burial depth (m) : 1
Product : Fibre optic cable
Weight (kg/m) : 5
Diameter : 46 mm