Home » Projets » 2009 KASHAGAN

2009 KASHAGAN

Provison of burial services for 1 power cable and 2 umbilicals.

Location : Kashagan oil field – Kazakhstan
Client : SONSUB (for SAIPEM)

Length (km): 18
Water depth (m) : 6
Vessel : Barge
Burial system : TM03 (Trencher)
Burial depth (m) : 2
Product : Flowline / Power cable
Weight (kg/m) : 1,4 
Diameter : 23 mm

Other projects

  • 1999 ELGIN FRANKLIN

    Platform to platform / Composite power and communication cable + 1 composite power / communication cable + 1 umbilical.
    Burial system : CASTOR 2 (Trencher)
    Plus d’infos
  • 2016 FITZROY Darwin

    1 separate shore end. 3km cable installation with laying and post burial. Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos
  • 2014 PERENCO RDC CONGO

    Laying of 43 km of power cable between mainland / platforms and platforms.
    Burial system : ROVJET806 + EBJ (jetting)
    Plus d’infos