Home » Projets » 2011 WACS

2011 WACS

2 separate FO shore-ends in Muanda (Congo Kinshasa) and Matombi (Congo Brazzaville) + 1 direct FO shore-end in Cabo Ledo (Angola). Installation of mattresses with ROS.

Location : Congo-Angola
Client : ALCATEL LUCENT

Length (km): 38
Water depth (m) : 20
Vessel : DP2 Barge
Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
Burial depth (m) : 1
Product : Fibre optic cable

Other projects

  • 2025 ZULUF

    Supply of personnel and trenching services for the burial of a 230 kV composite submarine cable in the Zuluf field
    Burial system :
    Plus d’infos
  • 2004 SIR BANIYAS

    Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos