Home » Projets » 2011 WALNEY 1

2011 WALNEY 1

Post Lay Inspection and Burial of infield power cables

Location : Walney Offshore Windfarm – Irish Sea
Client : VSMC-DONG

Length (km): 40
Water depth (m) : 20
Vessel : DP vessel
Burial system : ROVJET605 (jetting)
Burial depth (m) : 2
Product : Power Cable
Weight (kg/m) : max 19
Diameter : max 139 mm

Other projects

  • 2011 KASHAGAN

    Provison of burial services for 4 power and FO cables and 6 umbilicals.
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 2024 NIGERIA 2

    Separate landing at Qua Lboe. Laying and post-wiring of 22.4 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 2007 ATLAS OFFSHORE

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos