2012 CAT – THAÏLAND

2 separate pre-laid shore ends at Sri Racha and Songkhla + Installation of articulated pipes.

Location : Sri Racha and Songkhla / Gulf of Thailand
Client : ALCATEL LUCENT

Length (km): 27
Water depth (m) : 28
Vessel : Barge
Burial system : EBJ 04 + ESV12 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable

Other projects

  • 2007 PICOT / GONDWANA

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2001 ULYSSE

    Recover of existing cable (5 km), simultaneous lay and burial work (ESV12), PLIB work of joints (MED 1 and diver pump).
    Burial system : MED1 (Dredge pump) – ESV12 (Plough)
    Plus d’infos
  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos