Home » Projets » 2013 LONDON ARRAY

2013 LONDON ARRAY

Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.

Location : LONDON ARRAY Offshore Windfarm / Thames Estuary (UK)
Client : VSMC

Product : Power Cable
Length (km): 55
Water depth (m) : 0 to 25
Vessel : Barge
Burial system : ROVJET605 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 50
Diameter : max 157 mm

Other projects

  • 1999 CIRCE

    Cable deburial / reburial and cable loop burial on CIRCE fibre optic cable system.
    Burial system : MED1 (Dredge pump) – CASTOR (Trencher)
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos
  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos