2013 LONDON ARRAY

Provision of personnel and equipment to carry out the post burial of 54 infield cables, some in very shallow water.

Location : LONDON ARRAY Offshore Windfarm / Thames Estuary (UK)
Client : VSMC

Product : Power Cable
Length (km): 55
Water depth (m) : 0 to 25
Vessel : Barge
Burial system : ROVJET605 (jetting)
Burial depth (m) : 1.5 
Weight (kg/m) : max 50
Diameter : max 157 mm

Other projects

  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos
  • 2000 FLAG ATLANTIC 1

    3 separate shore end installations as part of the FLAG Atlantic 1 telecommunication cable system.
    Burial system : MED1 (Jetting) and ESV11 (Plough)
    Plus d’infos
  • 2008 DELMA

    Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.
    Burial system : TM04 (Trencher)
    Plus d’infos