Home » Projets » 2015 FITZROY Port Hedland

2015 FITZROY Port Hedland

2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching (both cables in the same trench) and surface lay with a minimum 5m separation between both cables. Installation of articulated pipes.

Location : Port Hedland / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 2 x 44
Water depth (m) : up to 17 m
Vessel : Barge
Burial system : TM04 (trenching) + EBJ (jetting)
Burial depth (m) : 0.5
Weight (kg/m) : 3.5
Diameter : 35

Other projects

  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2022 EQUIANO

    1 x Direct landing at Sesimbra, shell installation and post-burial.
    Burial system :
    Plus d’infos
  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos