Home » Projets » 2015 MANIFA

2015 MANIFA

Provision of personnel and equipment to carry out the trenching of 3 x 15 kV power cables and 2 fiber optic cables.

Location : Manifa – Saudi Arabia
Client : Mermaid Subsea Services LLc

Product : Power cable + Fibre optic cable
Length (km): 42 km
Water depth (m) : 4 to 15
Vessel : DP Barge
Burial system : TM03 (trenching)
Burial depth (m) : 1.3
Weight (kg/m) : 17.8
Diameter : 119 / 31 mm

Other projects

  • 2021 HORNSEA 2

    Provision of personnel and equipment to carry out the post lay burial of infield array cables.
    Burial system :
    Plus d’infos
  • 2018 IFA 2000 CABLES REPAIR

    Repair of 2 power cables being part of the IFA 2000 link on the beach at Sangatte.
    Burial system : ROVJET 605 (jetting) + Massflow
    Plus d’infos
  • 2025 PEARLS CABLE STORAGE

    Storage of fiber optic cable and repeaters in Bahrain
    Burial system :
    Plus d’infos