Home » Projets » 2015 MANIFA

2015 MANIFA

Provision of personnel and equipment to carry out the trenching of 3 x 15 kV power cables and 2 fiber optic cables.

Location : Manifa – Saudi Arabia
Client : Mermaid Subsea Services LLc

Product : Power cable + Fibre optic cable
Length (km): 42 km
Water depth (m) : 4 to 15
Vessel : DP Barge
Burial system : TM03 (trenching)
Burial depth (m) : 1.3
Weight (kg/m) : 17.8
Diameter : 119 / 31 mm

Other projects

  • 2017 BEATRICE OWF

    Provision of personnel and equipment to carry out the post lay burial of 56 infield power cables.
    Burial system : ROVJET 1210 (jetting)
    Plus d’infos
  • 2023 2 AFRICA SOUTH AFRICA

    1 x Direct landing in Port Elizabeth, shell installation, post beaching, clamp installation. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2020 Partnership with UXO Control

    Offshore campaign to identify and eliminate unexposed ammunition (UXO) on the site of the Saint-Brieuc wind farm
    Burial system : TRITON XLX200HP and ROV C 113
    Plus d’infos