2015 SEA LION Rostock

1 shore end in Germany :  laying and burial of FO cable + installation of articulated pipes. Laying and burial of the same cable offshore in Denmark, in low water depths.

Location : Germany – Denmark
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 9.7 + 8.2
Water depth (m) : up to 15 m
Vessel : DP vessel
Burial system : ROVJET404 + EBJ (jetting)
Burial depth (m) : 1
Weight (kg/m) : 3.6
Diameter : 35

Other projects

  • 2017 IFA 2000 CABLES REPAIR

    Repair of 4 power cables being part of the IFA 2000 link .
    Burial system : MED 1 (Dredge pump) + ROVJET806 (jetting)
    Plus d’infos
  • 2025 NOY YEU NOIRMOUTIER WINDFARM

    EPCI contract for the supply, installation and protection of inter-wind turbine cables for the YEU NOIRMOUTIER offshore wind farm.
    Burial system :
    Plus d’infos
  • 2015 FITZROY Port Hedland

    2 separate shore ends. Double 44km cable installation with simultaneous laying and trenching and then surface lay.
    Burial system : TM04 (trenching) + EBJ (jetting)
    Plus d’infos