Home » Projets » 2015 SEA LION Rostock

2015 SEA LION Rostock

1 shore end in Germany :  laying and burial of FO cable + installation of articulated pipes. Laying and burial of the same cable offshore in Denmark, in low water depths.

Location : Germany – Denmark
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 9.7 + 8.2
Water depth (m) : up to 15 m
Vessel : DP vessel
Burial system : ROVJET404 + EBJ (jetting)
Burial depth (m) : 1
Weight (kg/m) : 3.6
Diameter : 35

Other projects

  • 2025 ZULUF

    Supply of personnel and trenching services for the burial of a 230 kV composite submarine cable in the Zuluf field
    Burial system :
    Plus d’infos
  • 2012 PAIMPOL BRÉHAT

    Main DC power cable installation between mainland and 15 km offshore as part of EDF’s tidal generation project.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 2018 INDIGO

    Post lay inspection and burial of 39 km of fibre optic cable.
    Burial system : ROVJET 605 (jetting)
    Plus d’infos