Home » Projets » 2016 FITZROY Darwin

2016 FITZROY Darwin

1 separate shore end. 3km cable installation with laying and post burial.  Installation of articulated pipes.

Location : Darwin / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable
Length (km): 3
Water depth (m) : up to 20 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 2
Weight (kg/m) : 3.5
Diameter (mm) : 35

Other projects

  • 2001 APOLLO UK SHORE END

    Cable lay and burial BUDE shore end (UK).
    Burial system : TJV04 (Jetting)
    Plus d’infos
  • 2008 TAURT FIELD DEVELOPMENT

    Post trenching of subsea umbilical / PLIB
    Burial system : ROVJET401 (Jetting)
    Plus d’infos
  • 2008 PERENCO – CAMEROON

    Barge operating for pipe laying
    Burial system : N.A.
    Plus d’infos