Home » Projets » 2017 QUINTILLION ALASKA

2017 QUINTILLION ALASKA

1 separate shore end. 16 km cable installation with laying and burial.

Location : Prudhoe Bay/ Alaska
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable 
Length (km): 16
Water depth (m) : up to 15 m
Vessel : Barge
Burial system : ESV12 (Vibrating plough)
Burial depth (m) : 2
Weight (kg/m) : 4
Diameter (mm) : 37.5

Other projects

  • 2016 VEJA MATE

    Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 2008 KASHAGAN

    Fibre optic cable laying and burial between Island D and Atyrau (Kazahkstan)
    Burial system : TM03 (Trencher) + ESV12 (Plough)
    Plus d’infos
  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos