Home » Projets » 2017 SAFANIYA 5

2017 SAFANIYA 5

Provision of personnel and equipment to carry out the simultaneously trenching of five 15 kV submarine power cables on Safaniya 5 field.

Location : Safaniya 5 field – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable
Length (km): 22 km
Water depth (m) : 10-15
Vessel : Barge
Burial system : TM03 (trencher)
Burial depth (m) : 1
Weight (kg/m) : 19
Diameter (mm) : 100

Other projects

  • 1997 SOUTH KOREA

    Main land to Island / HVDC power cable extension with piggy-backed fibre optic cable
    Burial system : COPS (mattresses protection)
    Plus d’infos
  • 2003 ILE D’YEU

    Mainland to island / Shore ends / Laying and burial of 20 kV pc
    Burial system : N.A.
    Plus d’infos
  • 2018 ASC Perth

    1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.
    Burial system : TO Mobile (jetting)
    Plus d’infos