2018 ASC Perth

1 separate shore end. 10 km cable installation with laying and burial.  Installation of articulated pipes.

Location : Perth / Australia
Client : Alcatel-Lucent Submarine Networks Ltd

Product : Fibre optic cable 
Length (km): 10
Water depth (m) : up to 25 m
Vessel : Barge
Burial system : TO Mobile (jetting)
Burial depth (m) : 1
Weight (kg/m) : 2.8
Diameter (mm) : 37.5