Home » Projets » 2018 MERKUR OWF

2018 MERKUR OWF

Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.

Location : Merkur Offshore Windfarm / Germany 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 59
Water depth (m) : up to 30 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.5

Other projects

  • 2015 ILE D’YEU

    Surface laying of 2 sections of power cable YEU3 and YEU4.
    Burial system : N.A.
    Plus d’infos
  • 2025 MARJAN GOSP 4

    Supply of personnel and trenching services for two separate 230 kV composite submarine cable burial services on the Marjan field as part of the Marjan Oil-Gas Separation Plant No. 4 (MRJN GOSP 4) development project.
    Burial system :
    Plus d’infos
  • 2015 QUIBERON BELLE ISLE 4

    Laying of 14.5 km of hybrid cable between Quiberon and Belle Isle.
    Burial system : N.A.
    Plus d’infos