2018 MERKUR OWF

Provision of personnel and equipment to carry out the post lay burial of 57 infield power cables.

Location : Merkur Offshore Windfarm / Germany 
Client : Seaway Offshore Cables

Product : Power Cable 
Length (km): 59
Water depth (m) : up to 30 m
Vessel : DP Vessel
Burial system : ROVJET1210 (jetting)
Burial depth (m) : 1.5