2019 SAFANIYA 6

Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.

Location : Safaniya 6 field – Saudi Arabia
Client : Mc Dermott Arabia Company Ltd

Product : Power Cable / Umbilical / Flexible
Length (km): 18.6 km
Water depth (m) : 7.5
Vessel : Barge
Burial system : TM03 (trencher)
Burial depth (m) : 1
Weight (kg/m) : up to 84 (for 115 kV power cables)
Diameter (mm) : up to 215 (for 115 kV power cables)