2021 AMITIE

Separate shore ends in La Grigne. HDD Pulling, Laying and burial of 2.3 km of fibre optic cable.

Place: La Grigne (France)
Client : Alcatel Submarine Networks (ASN)

Product : fibre optic cable
Length:2.3 km
Depth: Up to 15 m
Ship: Barge
Burial system: Mass Flow Excavation
Burial depth: 1 m

Period: Sept 2021

Other projects

  • 2000 VNF LILLE

    Along river – canal / 1 telecommunication fibre optic cable.
    Burial system : Machine LD CABLE : Towed plough
    Plus d’infos
  • 2023 MARTINIQUE

    Installation of 2 new electrical links in the bay of Fort de France
    Burial system :
    Plus d’infos
  • 2025 2 AFRICA PEARLS

    Separate landing at Al Khobar. Laying and post-wiring of 35 km of fiber optic cable
    Burial system :
    Plus d’infos