Assistance to laying, PLIB

Location: Taiwan
Customer: SEAWAY 7

Length (km): 292 km
Water depth (m) :
Vessel: Seaway Phoenix
Beaching system: ROVJET 1206
Beaching depth (m): 1.5m
Product : Power cable
cable type: ø

Other projects

  • 2022 HORNSEA 2

    Assistance to laying, PLIB
    Burial system :
    Plus d’infos
  • 1998-1999 VNF PARIS

    Along river / Laying and burial of 3 multiple FO cables laid in one go
    Burial system : ESV 07 / ESV11 (Plough)
    Plus d’infos
  • 2024 DOGGER BANK B

    Supply of trenching support services, including personnel and equipment on board a dedicated trenching support vessel (TSV), for the Dogger Bank offshore wind farm inter-turbine cable installation and protection project.
    Burial system :