Home » Projets » 2024 MAJAN 1

2024 MAJAN 1

1 x Direct landing in Salalah, shell installation, post-sinking. Installation of grounding system

Location: Salalah Oman
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.5 km
Water depth (m) :
Vessel: N/A
Beam system: EBJ
Beam depth (m): 2m
Product : Fiber optic cable
cable type: ø37mm

Other projects

  • 2007 PICOT / GONDWANA

    FO cable shore ends – Post lay burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2023 GHANA

    Separate landing in Accra. Laying and post-wiring of 4.9 km of fiber optic cable
    Burial system :
    Plus d’infos
  • 1999 DCN TOULON

    Power and composite cables inside miltary harbour.
    Burial system : N.A.
    Plus d’infos