2024 NIGERIA

Separate landing in Lagos. 2.8 km of fibre-optic cable sunk in water

Location: Lagos NIGERIA
Customer : ALCATEL SUBMARINE NETWORKS

Length (km): 2.8 km
Water depth (m) :
Vessel: NORA B
Beam system: TO MOBILE / NV
Beam depth (m): 2.0 m
Product : Fiber optic cable
cable type: ø37mm