Home » Projets » 2000 Dumpton Gap – Level 3

2000 Dumpton Gap – Level 3

Remedial work : Lay and simultaneous burial of fibre optic cable.

Location : ENGLISH CHANNEL
Client : Offshore DUMPTON GAP LEVEL 3 FO cable system (ALCATEL SUBMARINE NETWORKS)

Length (km): 5,4
Water depth (m) : 25
Vessel : Barge
Burial system : ESV11 (Plough)
Burial depth (m) : 1,4
Product : Fibre optic cable
Weight (kg/m) : 5,4
Diameter : 46 mm

Other projects

  • 2014 PERENCO RDC CONGO

    Laying of 43 km of power cable between mainland / platforms and platforms.
    Burial system : ROVJET806 + EBJ (jetting)
    Plus d’infos
  • 2024 MORAY WEST

    Assistance to laying
    Burial system :
    Plus d’infos
  • 2015 WASIT

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM04 (trenching)
    Plus d’infos