Home » Projets » 2000 Dumpton Gap – Level 3

2000 Dumpton Gap – Level 3

Remedial work : Lay and simultaneous burial of fibre optic cable.

Location : ENGLISH CHANNEL
Client : Offshore DUMPTON GAP LEVEL 3 FO cable system (ALCATEL SUBMARINE NETWORKS)

Length (km): 5,4
Water depth (m) : 25
Vessel : Barge
Burial system : ESV11 (Plough)
Burial depth (m) : 1,4
Product : Fibre optic cable
Weight (kg/m) : 5,4
Diameter : 46 mm

Other projects

  • 2021 Saint Nazaire OWF

    EPCI contract for the Saint-Nazaire OWF Inter-array Cables Procurement, Installation and protection
    Burial system :
    Plus d’infos
  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2022 2 AFRICA & BLUE

    Pre Lay Grapnel Run (PLGR) & Route Clearance (RC) for the BLUE and 2Africa projects in the Mediterranean Sea
    Burial system :
    Plus d’infos