2007 PICOT / GONDWANA

FO cable shore ends – Post lay burial

Location : New Caledonia / Australia
Client : ALCATEL LUCENT

Length (km): 3
Water depth (m) : 20
Vessel : Inflatable / works craft 
Burial system : EBJ 04 (jetting)
Burial depth (m) : 2
Product : Fibre optic cable
Weight (kg/m) : 3,5
Diameter : 35 mm