Home » Projets » 2008 DELMA

2008 DELMA

Post trenching of 2 power cables between Shuwaihat (mainland) and Delma Island. Installation of articulated pipes.

Location : Delma Island (UAE)
Client : NEXANS Norway

Length (km): 85
Water depth (m) : 35
Vessel : Barge
Burial system : TM04 (Trencher)
Burial depth (m) : 1
Product : Power Cable
Weight (kg/m) : 55
Diameter : 194 mm

Other projects

  • 2009 KASHAGAN

    Provison of burial services for 1 power cable and 2 umbilicals.
    Burial system : TM03 (Trencher)
    Plus d’infos
  • 2016 VEJA MATE

    Provision of personnel and equipment to carry out the post lay burial of 73 infield power cables.
    Burial system : ROVJET 810 (jetting)
    Plus d’infos
  • 2004 SIR BANIYAS

    Lay and burial of 2×9 km of 33kV power cable between Jebel Dhanna and SIR BANIYAS (mainland to Island)
    Burial system : TM03 (Trencher)
    Plus d’infos