Home » Projets » 2011 WACS

2011 WACS

2 separate FO shore-ends in Muanda (Congo Kinshasa) and Matombi (Congo Brazzaville) + 1 direct FO shore-end in Cabo Ledo (Angola). Installation of mattresses with ROS.

Location : Congo-Angola
Client : ALCATEL LUCENT

Length (km): 38
Water depth (m) : 20
Vessel : DP2 Barge
Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
Burial depth (m) : 1
Product : Fibre optic cable

Other projects

  • 2006 JAKASUSI

    FO cable shore ends / Laying and burial
    Burial system : EBJ 04 (jetting)
    Plus d’infos
  • 2006 THAILAND KHO SAMUI

    Shore ends/Mainland to island/Laying and burial of 115 kV power cable
    Burial system : TJV05 – TJV08 (Jetting)
    Plus d’infos
  • 2017 LTAII

    Provision of personnel and equipment to carry out trebsching services on a total of 10 submarine power cables.
    Burial system : TM03 + TM04 (trenchers)
    Plus d’infos