2011 WACS

2 separate FO shore-ends in Muanda (Congo Kinshasa) and Matombi (Congo Brazzaville) + 1 direct FO shore-end in Cabo Ledo (Angola). Installation of mattresses with ROS.

Location : Congo-Angola
Client : ALCATEL LUCENT

Length (km): 38
Water depth (m) : 20
Vessel : DP2 Barge
Burial system : TJV05 – EBJ (jetting) – ROS (mattresses)
Burial depth (m) : 1
Product : Fibre optic cable

Other projects

  • 2014 BUTENDIEK

    Provision of personnel and equipment to carry out the post burial of 86 infield power cables.
    Burial system : ROVJET806 (jetting)
    Plus d’infos
  • 2022 2 AFRICA Spain

    1 x Direct landing in Barcelona, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2024 HAI LONG

    Post Lay Burial of EXP
    Burial system :