Home » Projets » 2013 VISCAS SIR BANYAS

2013 VISCAS SIR BANYAS

Lay and burial of 2×13 km of 132kV power cable + 2x13km FO cable between Shuweihat and SIR BANIYAS (mainland to Island)

Location : Sir Banyas Island (UAE)
Client : VISCAS
Length (km): 2 x 13
Water depth  (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trencher)
Burial Depth (m) : 1
Product : power cable + FO cable
Weight (kg/m) : 55
Diameter : 226 mm

Other projects

  • 2015 ABU ALI

    Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable.
    Burial system : TM03 (trenching)
    Plus d’infos
  • 2019 SAFANIYA 6

    Provision of personnel and equipment to carry out the trenching of 11 submarine cables, umbilicals and flexibles on Safaniya 6 field.
    Burial system : TM03 (trencher)
    Plus d’infos
  • 1998 BELIZE

    Main land to island / 34.5 kV power extension.
    Burial system : TJV04 (Jetting)
    Plus d’infos