2015 WASIT

Provision of personnel and equipment to carry out the post lay trenching of a 15 kV power composite cable in shallow water.

Location : WASIT field – Saudi Arabia
Client : Subtech Qatar Diving and Marine Services/ Saudi Aramco

Product : Power Composite Cable
Length (km): 9.2
Water depth (m) : 0 to 35
Vessel : Barge
Burial system : TM04 (trenching)
Burial depth (m) : 0.6 to 1.1
Weight (kg/m) : 16
Diameter : 106 mm

Other projects

  • 2022 2 AFRICA SOUTH AFRICA

    1 x Direct landing at Duynfontein, shell installation and post-burial. Installation of grounding system
    Burial system :
    Plus d’infos
  • 2023 MARTINIQUE

    Installation of 2 new electrical links in the bay of Fort de France
    Burial system :
    Plus d’infos
  • 2011 ORMONDE WINDFARM

    Post Lay Inspection and Burial of 32 infield power cables.
    Burial system : ROVJET605 (jetting)
    Plus d’infos