2026 CSN-1 (Ecuador)
Direct shore landing at Anconcito (Ecuador), shell laying and post-lay burial of 2.7 km of fiber optic cable.
Location: Anconcito – Ecuador
Client: ASN
Year: January 2026
Length (km): 2.7 km
Burial system: EBJ
Product: Fiber optic cable




